Start with the exact work, not the label

“Soft landscaping” can mean anything from reseeding a lawn to planting trees or reshaping a garden. That label alone cannot tell you whether consent is needed. The useful first step is to write down what will physically change: what is being removed, what is being added, where digging is planned, and whether the ground level or drainage will change.

Whether planning permission is needed depends on the property and the work proposed. Check with the local council before treating a general rule as confirmation for your site. But a property may have restrictions that affect what you can do. Conditions attached to an earlier planning approval, a lease, a covenant or a protected status can matter even when the work looks modest. So treat the general rule as a starting point, not confirmation for your own site.

Five checks you can make yourself

1. Confirm who controls the land

Check that the area is within your property and that you have the right to alter it. This is particularly important for shared gardens, rented homes, flats with communal grounds and commercial premises. A landlord, managing agent, freeholder or landowner may need to agree to changes even if the work would not ordinarily need planning permission.

If a boundary is unclear, do not assume that the visible edge of a lawn or planting bed marks the legal boundary. Check your property documents and raise the question with the relevant owner or managing agent before agreeing a layout.

2. Look for restrictions already attached to the property

Search your paperwork for planning conditions, conservation requirements, lease terms or legal restrictions recorded against the property that refer to gardens, planting, trees, boundaries or alterations to the grounds. If you cannot find the relevant documents, ask the person or organisation that manages the property.

For a site in Buckingham, Milton Keynes or elsewhere, the council can help you check whether a condition on an earlier planning approval or a local protection affects the proposed work. Give them a clear description and, where useful, a simple sketch. “Garden landscaping” is vague; “removing this hedge and planting a row of trees beside the access” gives them something specific to assess.

3. Be precise about trees and existing features

If your plan involves removing or changing an existing tree, check its status before any work is agreed. Some trees may have legal protections that affect what work can be done to them. Check with the council about the particular tree and whether consent is needed. Do not assume a tree is unrestricted because it is in a private garden or because the proposed work seems minor. Ask the council how to check the particular tree and what consent, if any, is required.

Keep this separate from planting new trees. The question is not only whether a tree can be planted, but whether the chosen position is suitable for the property and does not conflict with a restriction, boundary, access route or underground service.

4. Check what lies below the surface

Before digging, find out whether service pipes or cables may run through the area. Look for available property plans and ask the relevant utility provider or site manager if their records are needed. Do not rely on visible clues or guess where a service runs. If the route remains uncertain, pause ground disturbance and seek appropriate help to establish it.

This check matters even for a planting scheme. A small hole can still meet a buried service, and a larger planting bed may involve more ground disturbance than the finished surface suggests.

5. Ask the council about the specific proposal

If any restriction is unclear, contact your council's planning team before work begins. Explain the property location and describe the proposed changes, including removal, excavation, levels and planting. Ask whether planning permission, another consent or a separate permit applies. Keep the reply with your project notes.

A permit is not a catch all for every garden job. Requirements depend on the activity and location. If work would affect a public highway or land you do not control, ask the relevant authority or owner what approval is needed rather than assuming your planning check covers it.

Where your own checks should stop

These steps help you identify questions early; they are not a substitute for a decision from the relevant authority or landowner. If the property has a planning condition, a protected tree, unclear ownership or uncertain underground services, do not treat silence or an online search result as permission. Get the point clarified before finalising the work.

The more clearly you can describe the proposed layout, the easier it is to get a useful answer. Our Soft Landscaping page gives an overview of the service, but the permissions question belongs to the particular property and scope. If you are planning work in or around Buckingham, here at RMS Landscapes we can discuss your proposed soft landscaping.